TERRA MINI-JET MJ 1600 drills in the city Chur in the Alps

© TERRA AG, Reiden, Switzerland
In the Swiss city Chur a new house connection had to be laid underneath the Masanser Street, which goes directly to the highway. The house connection required a protection pipe OD 90 mm (3.5“) for a gas line. It had to be laid trenchless. The contractor HEW AG received the order from the Authorities Industrielle Betriebe Chur IBC. The ground consisted of very compacted gravel. Therefore the TERRA MINI-JET MJ 1600 was used with the TERRA-ROCK Air Percussion Head ø 65 m (2.6“). The pilot bore was drilled with a directional rock bit ø 76 mm (3“). For the expansion of the bore hole this rock bit was replaced by a hole opener bit ø 110 mm (4.3”), which drilled through the bore channel for a second time. Then the pipe OD 90 mm (3.5”) was pulled in. The TERRA-ROCK Air Percussion Head 65 mm (2.6“) with the directional rock bit ø 76 mm (3”). The TERRA-ROCK Air Percussion Head reaches the target pit. The pilot bore was finished. Then the hole opener bit ø 110 mm (4.3”) was assembled. The bore channel has been successfully expanded up to 110 mm (4.3“). The protection pipe OD 90 mm (3.5”) has been pulled in. Then the gas line could be pushed through the protection pipe.
© TERRA AG, Reiden, Switzerland
© TERRA AG, Reiden, Switzerland
© TERRA AG, Reiden, Switzerland

© TERRA AG, Reiden, Switzerland
© TERRA AG, Reiden, Switzerland
© TERRA AG, Reiden, Switzerland

 arriba

TERRA AG für Tiefbautechnik - Hauptstrasse 92 - 6260 Reiden - Schweiz - Tel. +41 62 749 10 10 - office@terra-eu.eu