Backyardcrossing in Bernese Oberland - TERRA-HAMMER T 105 F

The T 105 F earthmover renews the drinking water system in the community of Bönigen.
The company Gerber + Troxler Bau AG from the Bernese Oberland is rehabilitating the drinking water system. For the trenchless installations, especially house connections, the new piercing tool TERRA-HAMMER T 105 F was used. With the oversized end sleeve the 105 mm machine also allows pulling in of bigger pipes as in this case a 112 mm short pipe. The piercing tool was set up in the natural stone masonry within the basement. From there it drilled and installed simultaneously the protective pipes underneath the 7 m backyard. Into these protective pipes will then be installed the product pipe.


Pic 1: The T 105 F earthmover renews the drinking water system in the community of Bönigen.

Pic 2: Installation of the piercing tool and the short pipes in the basement before starting the machine.

Pic 3: The oversized end sleeve expands the bore channel to 130 mm.

Pic 4: The T 105 F reaches the target with precision and at ease.
Installation of the piercing tool and the short pipes in the basement before starting the machine.
The oversized end sleeve expands the bore channel to 130 mm.
The T 105 F reaches the target with precision and at ease.